The E-Cat Home, i.e. The 1 MW Power Plant, Was Pretested Over The Course Of This Past Sunday

| October 24, 2011 | 0 Comments

This past Sunday a pretest of the first 1 MW power plant, operated y E-Cats. This E-Cat home – allow me to call it that, as this first power plant is nothing less than an E-Cat home; a home, where everything will be decided upon once and for all – needed to be pretested as the ultimate test with prolific scientists and journalists is going to take place in only several days.

The 28th of October will usher in this new technology in a way that has never been done before. All previous tests were conducted with and/or upon one device, whereas this test will have to do with multiple E-Cats operating the 1 MW power plant.
Speaking of the E-Cat news, Rossi also revealed that – in opposition to the formerly believed rumor that there would be no report or anything of the like right after the test – each hour some test data will be posted on the Rossi’s blog, and a full report accompanied by a video will be published at the same website.
The nature of the customer of this E-Cat home is still unknown, and there are slim chances that it will be revealed before the test is completed and proved to be successful. There is too much at stake for any respected company or entity to embrace a yet-unproved technology. Thus, it is likely that the customer will reveal its “face” only after the success story of E-Cat is out there in the open. If, however, the test is not successful – for which Andrea Rossi will be given two months to correct the mistakes and imperfections – the identity of the customer will remain uncompromised.

Tags: , , ,

Category: Andrea Rossi, E-Cat, E-cat Home, Energy Catalyzer

Comments (0)

Trackback URL | Comments RSS Feed

There are no comments yet. Why not be the first to speak your mind.

Leave a Reply